$BE is cutting the time it takes to bring new power online by more than 40% with its new Power Connect system. The system shifts critical electrical work into the factory so Bloom can deliver pre-wired, installation-ready power faster as AI data center demand accelerates. https://t.co/kcHlAGynfA
View on X ↗